brusierlover2528 brusierlover2528
  • 01-05-2018
  • Social Studies
contestada

____ involves doing whatever you can to make sure the positive risk happens.

Respuesta :

andriansp andriansp
  • 11-05-2018
I believe the answer is: Risk exploitation

Risk exploitation refers to the process of eliminating uncertainties that might cause a certain damage for us in the future.
This action is being done by analyzing each possible risks and creating specific preparations to tackle those risks in the future.
Answer Link

Otras preguntas

what will happen if the social problems are not controlled on time ?​
4 pairs of pants for 22.60. what is the unit rate?​
diffusion welding process in welding of. Ti–6Al–4V to Ti–6Al–6V–2Sn
A cube has sides of length 5 cm. Find the total surface area of the cube. Please explain as well, as I struggle with surface area.
HELP!!! How do erosion and deposition work together to shape earths landscape?
6 Discuss how most liberianCarntheir living ?​
The computer that can be used for performing the daily life tasks that might include emailing, browsing, media sharing, entertainment etc
A rectangle piece of land is 400m*150m.Find the cost of the piece of land if one square meter of land costs ₹15,000.​
1. Many houses in rural Mexico are built by the owner out of... (Select all that apply.) cinder block mud sticks bricks
what do you notice?what do you wonder?what do you think?​