alyssaaaaaa1 alyssaaaaaa1
  • 02-05-2017
  • Mathematics
contestada

it takes three days for a construction company to prepare a model of a building for their client . how many full models can they prepare in 86 days

Respuesta :

Nadia2004
Nadia2004 Nadia2004
  • 02-05-2017
they would create 28 full models
Answer Link
Bea1111 Bea1111
  • 02-05-2017
You divide 86 by 3 to get the answer.
Answer Link

Otras preguntas

factoring 12m^2n^2-8mn+1=
Consider the following system of equations. y = 2x - 2 y - 2x = 5 What can you conclude about the system of equations? The system of equations is inconsistent.
One way to show that a statement is NOT a good definition is to find a _____ converse.conditional.counterexample.biconditional.
. What are three factors that could contribute to a source not being credible?
what city is located 60 north 25 east
name 2 sound devices and what type they are from the song Where Is The Love by the Black Eyed Peas.
What is the difference between displacement and double displacement reactions?Write equations for these reactions?
Which statement is NOT true?A.  If two coplanar lines do not intersect, then the lines are parallel.B. Two lines lie in one plane and do not intersect if and on
One-half of a number is -12. Find the solution ???
2(n-3)=4n+1 this sucks not knowing the answer