emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

one way that animals adapt to seasonal change
The length of an arc of a circle is equal to 1/5 of the circumference of the circle. If the length of the arc is 2π, the radius of the circle is
What is the value of 9P5? A. 45 B. 126 C. 15,120 D . 59,049 A cooking club has 12 members.How many ways can they select a president and vice presiden
what is the term for the condition where red blood shrivels?
how far away is all 9 planets from the sun
Why can't plants and animals use the nitrogen directly from the atmosphere? Answer A.There is not enough of it in the air. B.Nitrogen gas contains the element i
For f(x)=3x+4, find f(2) and find x such that f(x)=17
A certain animal in the zoo has consumed 39 pounds of food in six days. If it continues to eat at the same rate, in how many more days will its total consumptio
What is the main difference between the right side and left side of the heart?
How does Macbeth persuade the murderers to help him? He tells the murderers that it was really Banquo who did some things they thought Macbeth had done to harm