In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

weights of cars passing over a bridge part 2​
Under what condition(vector A + vector B)= (vector A) + (vector B) holds good?
Select the best answer from the multiple choices below In Florida, a BAC of .08 and above does not create a presumption of impairment - it must be proven throug
Write two equations that can be used to solve the equation. |6 + 7a| = 22
2 H2 + 2 NO → N2 + 2 H2O the observed rate expression, under some conditions, is: rate = k[NO]2 Which of the following mechanisms are consistent with these data
A narrow beam of light from a laser travels through air (n = 1.00) and strikes the surface of the water (n = 1.33) in a lake at point A. The angle of incidence
Probability distribution part 2​
What is the length of the altitude of an equilateral triangle with side a?
"People who measure high in "conscientiousness" (strong sense of duty, discipline, impulse control) and "emotional stability" (even-temperedness) tend to be str
(b) (i)how to simplify? (ii)how to factorise?