sadikshyapoudel015
sadikshyapoudel015 sadikshyapoudel015
  • 03-02-2022
  • Mathematics
contestada

a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

if silicon has a charge of -4, how many electrons does it have
Which would require a greater force -accelerating a 10g mass at 5ms-2 or a 20g mass at 2ms-2?
The number 199,557 contains two sets of digits in which one digit is ten times as great as the other. What are the values of the digits in the set
How do you solve $278.10 divided by 45??
A city has a population of 220,000 people. suppose that each year the population grows by 8.75%. what will the population be after 6 years?use the calculator pr
A pink crayon is made with 12\text{ mL}12 mL12, space, m, L of red wax for every 5\text{ mL}5 mL5, space, m, L of white wax.
What is E=mc2? please be specific.
I don’t understand the question
Does the presence of acid-fast organisms in a clinical specimen always suggest serious clinical disease? why or why not?
Find the equation for the tangent line to the function f(x) = 4x3+3x2+5x+6 when x = 2. put your answer in slope intercept (y= mx+ b.format, and use it to identi