Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

What characteristic of effective public speaking is at the core of being audience-centered?
a hiker descends from a mountain peak. if the hiker descends at a rate of 700 ft every half hour, what is the hikers elevation relative to the peak after 3 hour
A moving object has a kinetic energy of 150 j and a momentum with a magnitude of 30.0 kg•m/s. determine the mass and speed of the object
Transform boundary is what
Which budgeting questions should Sara ask when deciding whether to rent or buy a house? Check all that apply.
A car rounds a 75-m radius curve at a constant speed of 18 m/s. a ball is suspended by a string from the ceiling the car and moves with the car. the angle betwe
In a 100 capitalist structure the owners are offered what advantages
which expression is equivalent to 3/x5y? A. x5/3y B. x5/3y1/3 C. x3/5y D. x3/5y3
Can someone please help!!! Its for chemistry and i looked everywhere even my text book and got no answer
The emphasis on quality has evolved through four distinct stages since world war ii. listed chronologically, these stages are: