The main outputs of which process are a quality management plan, quality metrics, project management plan updates, and project documents updates?

Respuesta :

PiaDeveau PiaDeveau
  • 09-07-2021

Answer:

Process asset updates.

Explanation:

Quality assurance assessments, validated modifications, authenticated deliverables, performance at work indicators, configuration management, project management plan modifications, project document security patches, and organisational process asset updates are the key outputs of quality assurance.

Answer Link

Otras preguntas

What is elaborative encoding?
Every time an impulse travels down the axon, we say that the axon has "fired," or "responded." this impulse is also called the
Which of the following represents the general formula of a circle? y = ax2 + bx +c x2 + y2 = r2 Ax + By = C y = mx + b
A line segment has endpoints (-2,-3) and (4,4). Find the length of the segment and find the midpoint.
What name was given to journalism that focused on eye-catching stories and not necessarily the truth? A. Yellow journalism B. Blue journalism C. Fak
Of all the factors affecting a region's climate, which one has the largest influence? a. Elevation c. Latitude b. Longitude d. Position on a continent
The ozone layer protects living things on Earth from
√3 + i[tex] \sqrt{3} + i[/tex]
Https:// the person most often called the "first civilized american" was
Tran wants to live a long and healthy life. the most important thing he can do to improve longevity is: