victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

which are synonyms? a. farm/corn b. river/stream c. walk/talk d. house/garden
5x + 10y = 18 x = y - 6 Which of the following equations is the result of substituting y - 6 in for x in the first equation? 5x + 10y - 6 = 18 5y - 6 + 10y = 18
you have two pendulums with cords that are exactly the same length. one is on earth (with an acceleration due to gravity of 9.81 meters/second2) and the other o
for his long distance phone service, manuel pays a $2 monthly fee plus 12 cents per minute. last month, manuel's long distance bill was $14.36 . for how many mi
what does sovereignty mean
Hailey works at a gift shop after school. She is paid $10 per hour plus 15% commission on merchandise she sells. Select an equation that represents her earnings
how does mining affect local populations? a. mining is a vital part of the economy of surrounding towns. b. mining introduces pollution into local water supplie
write the verb in parenthesis in the imperfect tense. antes yo ____ en la clase de historia. (estar) (1 point)
what is the percent by mass of carbon10 hydrogen 14 nitrogen 2
what religion did not claim its spiritual homes in the middle east