It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

A nerve net can best be described as _____. a. a centralized nervous system b. a group of ganglions c. a mesh of interconnected neurons d. cephalization
EXPLAIN WHY THE SYSTEM HAS THE ANSWER GIVEN. SOLVE EACH SYSTEM BY ELIMINATION TO PROVE YOUR ANSWER.​
What value should be added in the blanks to complete the square?
During an experiment, the temperature of a liquid increased 6 degrees in 30 minutes. The temperature increased at a steady rate. By how much did the temperature
Two planes left simultaneously from the same airport and headed in the same direction towards another airport 3600 km away. The speed of one of the planes was 2
Which of the following circles have their centers in the second quadrant? Check all that apply. A. (x+3)2 + (y-2)2 = 8 B. (x - 2)2 + (y + 7)2 = 64 C. (x+12)2 +
Type an equation for the following pattern
How do you balance redox equations in acidic solutions?
In the btnSub_Click event handler, add the Visual Basic instructions to do the following: A. Define a procedure level constant named intTwo with an integer dat
Sara, Nick and June share some sweets in the ratio 5:5:1. Sara gets 45 sweets. How many sweets are there altogether?