A list of all parts and materials needed to assemble one unit of a product is called:________.
a. a master schedule.
b. a kanban.
c. an inventory record file.
d. a bill of materials.

Respuesta :

aakritiraushan
aakritiraushan aakritiraushan
  • 01-12-2020

Answer:

(d ) . A bill of materials.

Explanation:

I hope help you !!!!!!!

Answer Link

Otras preguntas

The temperature of 15 grams of water increases by 3.0 degress. how much heat was absorbed by water?
Find the time water would take to fall from each height in the table to its starting level
A story's exterior narrative is the
To make synthetic elements scientists use a machine called
3x + y = 17 and 4x - y = 18
At this 1945 conference Harry Truman, Clement Attlee, and Joseph Stalin met to discuss how to administer punishment to Germany following her unconditional surre
Waves are created when a source of _________ (force) causes a vibration.
This is a typical grassland food web. It is also a small picture of an important cycle on Earth: the carbon cycle. Describe how the carbon gets into this food w
when this current is closed which way does the current flow
Roman religion was adapted from the