fghdkdidjc6574 fghdkdidjc6574
  • 03-04-2020
  • Business
contestada

Waterway Company assigns overhead based on machine hours. The Milling Department logs 2540 machine hours and Cutting Department shows 3940 machine hours for the period. If the overhead rate is $3 per machine hour, the entry to assign overhead will show a ________.

Respuesta :

mmaeh1408 mmaeh1408
  • 03-04-2020

Answer:

Change!

Explanation:

Answer Link

Otras preguntas

Multiplication two digits by two digits 73x45
why was rosa parks influential
what concentrates on the mass in a atom ​
The seventh grade class supplied bags of snacks and beverages for the school dance They supplied19 more beverages than bags of snacks The dance was supplied wit
The bimetallic standard refers to a. the change that occurred in which paper money was integrated with silver coins. b. the federal government's plan for the ty
A (n) ____ is one of earth’s major land ecosystems with its own characteristic Animals, plants, soil, and climate
You’re in a mall and you need some money to buy a nose ring, but you’re broke. You decide to scoop some quarters out of the fountain. The water in the fountain
How do you determine the slope of a line
What is the temperature range in the Mesosphere? °C to C
Percent of change from 8,700 to 6,400?