contestada

A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Which word in the sentence is the predicate nominative? At the fair, the turtle races have become an annual event. A. event B. annual C. races D. fair
In northern Canada the people of ___________________ have their own local government.
a shift in thought can be indicated by the use of A) semicolon B) an ellipsis C) an em dash D) a conjunction
What's the answer to this math problemĀ 3x +2/5=7
Paint is red : blue in a ratio of 2 : 4. If 5 litres of red is used how much blue is used
List two ways in which the albany plan of union would have helped the colonies fight the french.
Match each vocabulary word with the sentence it best completes.
is 0.4 less than, greatest than, or equal to 44%? explain
Jerry spend $42 to by some shirts. Each of the shirts cost the same whole-dollar amount. How many shirts could he have bought? a.4 b.5 c.6 d.8
100.5 divided by 1.5