​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

When Rapa Nui (Easter Island) was colonized by a small number of humans it was covered with trees and abundant food types. Within a thousand years the Rapa Nui
during the first 30 minutes of flight the Concorde climbs from ground level to an altitude of 43,000 feet. what is the concordes' rate if change in altitude dur
What is the value of k in the function ƒ(x) = 112 - kx if ƒ(-3) = 121?
helppppppppppppppppppp
The x-values in the table for f(x) were multiplied by -1 to create the table for g(x). What is the relationship between the graphs of the two functions?f(x)x y-
Active transport is different from passive transport in that active transport involves
Someone please help me answer these
plz tell me the answer here is the picture of the question also tell me how you did it THX
Points S, U, and T are the midpoints of the sides of PQR. Which statements are correct? Check all that apply. 1/2 QP = UT 1/2 TS = RQ SU = PR SU ∥
How do media and networks interact? A. Networks and media work in exactly the same way. B. Media are connected to networks that make information easier t